NEW paradigm in polymer pipelines industry:

the two stages of polymer pipes production

First stage:

Profile manufacturing and wrapping on coils

SECOND stage:

Mobile unit produces pipes directly at the construction site

CONVENTIONAL vs PIPES.ONE METHOD

CONVENTIONAL

Factory

• Manufacturing of pipes of various diameters
• Several lines for different pipe diameters

 

• Loading
• Delivery of pipe + air
• Unloading
• Approx. 200-300 km

 

Distributors

Storage of assortment of pipes of various diameters in regional warehouses

• Loading
• Delivery of pipe + air
• Unloading
• Approx. 100-200 km

 

Construction companies

Installation works on site:

Laying & joining of pipe elements with each other

PIPES.ONE

Stationary workshop

• Profile manufacturing and wrapping on coils
• Standard polymer raw materials

 

R=1000 km.
No need in warehouses or distributors!

 

Mobile unit

Manufacturing of the required diameter (300-2000 mm) and unlimited length pipe on site in the mobile workshop with simultaneous laying of pipeline